English [Change]
Back to Main Menu

Select a language

  • English
  • Español
  • Português
  • 简体中文
veichi logo
  • About Us
    Back
    About Us

    About Us

    • Our Company
  • Products
    Back
    Products

    Hybrid Inverter

    • Three Phase Hybrid Inverter
    • Micro Grid Hybrid Inverter

    Off-grid Inverter

    • 24/48V Off-grid Inverter

    On-grid Inverter

    • Single Phase On-grid Inverter
    • Three Phase On-grid Inverter

    Battery

    • LV Lithium Battery
    • HV Lithium Battery
  • Solutions
    Back
    Solutions

    Solutions

    • Residential System
    • C & I System
  • Support
    Back
    Support

    Support

    • Download
    • Cases
    • Blog
    • Contact Us
  • News & Events
    Back
    News & Events

    News & Events

    • Company News
    • Exhibitions
    • VEICHI Day
    Contact English

    Select a language

    • English
    • Español
    • Português
    • 简体中文
    1. Home
    2. Product Launches删除
    3. ID Engineer's Product Story · SI22 Birth Record

    ID Engineer's Product Story · SI22 Birth Record

    Mar 15, 2019

    This article will tell you about the development process of SI22 from the perspective of an ID engineer.

    Hello everyone, I am an ID engineer of VEICHI, I am coming again.

    The product to be introduced to you this time is an integrated special machine developed by VEICHI: SI22 solar pump inverter.

    Process

    Process

    SI22 is a new cost-effective, economical, compact and innovative PV pump inverter. Its superiority is reflected in: Intelligent IOT,optional IOT module, which integrates online, offline and WIFI functions; MPPT Technology: Automatic MPPT technology, full voltage range tracking; drive a variety of pumps: powerful, it can drive both conventional pumps and PMSMs.

    Relying on the PLM R&D management system, every detail of hardware, software, structure, appearance and testing in the SI22 development process has been repeatedly tested and simulated.

    SI22 solar pump inverter

    SI22 solar pump inverter

    The core requirements of this product are: slim and compact, cost-effective and high reliability.

    At the same time, as a series of products integrated with solar pumps, it is necessary to maintain the family and continuity of the PV pump special machine series.

    Conceptual stage

    Conceptual stage

    Conceptual stage

    In the prototype stage of the product concept, the concept prototype is first established according to the basic needs. ID engineers use the conceptual model as a medium to communicate with other members of the project team to brainstorm and explore the possibilities and feasibility of various options.

    The model effect of the concept stage is open and changeable. At this time, the design thinking can diverge in different directions. This is the most free and flexible stage of the design idea, and it’s full of various possibilities.

    Overview stage

    Overview stage

    Overview stag

    The work to be done in the outline design phase is based on the results of the concept phase, it’s work for balancing the needs of software, hardware, structure, and market in all aspects, and gradually narrowing the scope of the trial.

    The way of the program is expressed is also transformed from a rough conceptual rendering to a delicate simulation rendering, which is more intuitive and clear for the details of the product.

    At the end of the summary phase, the prototype of the SI22 has been basically formed: the CMF (color, material, facial treatment process) of the product has been roughly determined; at the same time, the main appearance elements of the product such as buttons, indicators, terminals, explanatory text, etc. It has been basically determined, and the details of the product can be adjusted later.

    Detail design

    Detail design

    Detail design

    In the detail design phase, each change has been carefully considered and revised.

    For the contents of the SI22 mask, the project leaders Mr. Wang and Mr. Xing repeatedly rethought and constantly considered the market demand and the user's use environment. After many revisions, the final mask content was finally finalized.

    During this period, Mr. Xing repeatedly went to Dubai, India and other countries for market research. In addition to the busy work schedule abroad, he also has to overcome the time difference and continuously communicate with the domestic project team about the project content and follow up the progress of the project.

    Mr. Xing, Mr. Wang, and every member of the project team, everyone is working hard on the SI22 project. The ultimate goal is to produce a high-scoring answer to the market and produce a product that is satisfactory to customers.

    Sample follow-up

    Sample follow-up

    Sample follow-up

    After finalizing the product details, it is necessary to make a hand-made and proofing product.

    When you get the physical products, I can have a more intuitive understanding of the design results, I may find some 3D models and renderings cannot show the problems. By correcting and adjusting these problems, we finally get products that can be trial-produced and mass-produced.

    The above process is from the perspective of ID engineers describes the general process of the birth of SI22. In the process of product development, all departments must continuously communicate, discuss, and modify each other under the leadership of the project leader. In such a reciprocating cycle, the balance point and the optimal solution are finally found among the dominant factors, and resulting in a final product design.

    In the future, VEICHI will continue to drive an endless R&D attitude: strive for excellence, strive to make products better and give customers a better experience.

    A photo of the SI22 solar pump inverter and the “Cousin" SI30 solar pump inverter are attached at the end of the article!

    SI22&SI30 solar pump inverter

    SI22&SI30 solar pump inverter

    Read previous post:

    The glimpse in the blossom of AC10

    Read next post:

    ID Engineer's product story · AC10 birth record

    You may also like

    VEICHI V9E Series General Servo Motor Underwent Complete Iteration

    VEICHI V9E Series General Servo Motor Underwent Complete Iteration

    Dec 09, 2024
    VEICHI VH600 PLC Born for Integrated and Precise Smart Control

    VEICHI VH600 PLC Born for Integrated and Precise Smart Control

    Nov 04, 2024
    New Generation of Omnipotent SD860 Bus Servo Multidrive System

    New Generation of Omnipotent SD860 Bus Servo Multidrive System

    Oct 31, 2024
    10mm DC Brushless Coreless Motor System

    10mm DC Brushless Coreless Motor System

    Jul 03, 2024
    CH610 Integrated Hoist Drive Debut on China Heavy Machinery Industry Association-Gantry Crane Branch

    CH610 Integrated Hoist Drive Debut on China Heavy Machinery Industry Association-Gantry Crane Branch

    Jan 18, 2024
    When is the AC300 Properly Equipped?

    When is the AC300 Properly Equipped?

    Oct 18, 2023
    Breakings - VEICHI New Robot Core Components Hit the Stage

    Breakings - VEICHI New Robot Core Components Hit the Stage

    Sep 12, 2023
    VEICHI VC5 Series PLC Provides Intelligent Solutions for Slicers

    VEICHI VC5 Series PLC Provides Intelligent Solutions for Slicers

    Oct 14, 2022

    Subscribe to our newsletter

    About Us

    • Our Company
    • Company News
    • Exhibitions
    • VEICHI Day

    Products

    • Hybrid inverter
    • Off-grid lnverter
    • On-grid Inverter
    • Lithium Battery

    Solutions

    • Residential System
    • C&I System

    Support

    • Download
    • Cases
    • Blog
    • Contact Us

    Subscribe to our newsletter

    Contact Us

    • Email: [email protected]
    • Mobilephone: +86-13828818903
    • WhatsApp: +86-13828818903
    • Wechat: +86-13828818903
    • Skype: [email protected]
    Copyright 2026 © Suzhou Veichi Electric Co., Ltd. All Rights Reserved.
    • Privacy
    • Terms of use
    • Cookies
    Leave a message
    Leave a message
    Leave a Message